Solutions / Smart Energy Storage Solution (C&I BESS)

SENOT solution

Smart Energy Storage Solution (C&I BESS)

Commercial & industrial battery storage from a single 261 kWh liquid-cooled cabinet to multi-MWh stations — peak shaving, demand management, backup power and PV time-shifting, controlled by the HMQ-EMS-300 with industry-first full-scenario active protection.

Overview

SENOT's storage solution covers the full C&I range: standard 261 kWh liquid-cooled cabinets for factories, malls and hotels; parallel-controlled clusters of up to 10 cabinets (2.15–2.61 MWh); and master/slave architectures scaling to 50 cabinets with 215–578 kWh units for large stations. Containerised storage adds an EMS dual-network master/backup scheme for uninterrupted control.

Value delivered — peak shaving and tariff arbitrage (charge at off-peak, discharge at peak), PV energy time-shift for higher self-consumption, demand charge management for two-part tariffs, and UPS-grade backup for critical loads. Storage also enables capacity expansion without upgrading the transformer.

Safety by design — the HMQ-EMS-300 runs an industry-first full-scenario active protection system: a risk-factor library across cell voltage/temperature, HV box and PCS temperature, continuously scored by AI and acted on automatically. Its flexible pulse charge/discharge algorithm keeps cells balanced, prevents over-charge/over-discharge at 100%/1% SOC and improves usable efficiency by more than 5%.

Key Advantages

Active protection

AI risk scoring across cells, HV box and PCS with automatic graded response

Flexible charge/discharge

Pulse control keeps cells balanced, full charge/discharge without damage, +5% efficiency

Anti-backflow & demand algorithm

Millisecond sampling suppresses swings while maximising charge/discharge cycles

Three cluster architectures

Parallel master, station master or master/slave — 1 to 50 cabinets

Liquid-cooled cabinet

LFP 314 Ah cells, 261 kWh, 125 kW, IP55, -30…+55 °C, perfluorohexanone fire suppression

AI O&M

Load forecasting, automatic scheduling, graded alarms and auto-dispatched work orders

Applications

Manufacturing plantsChemical sitesShopping mallsHotelsOffice towersData centresTelecom

Reference Projects

  • Data-centre storage, 2.5 MW / 6.69 MWh — centralised BESS for peak shaving, arbitrage, power-quality improvement and backup; EMS-300 plus energy management platform.
  • Hybrid storage, 2.5 MW / 8.36 MWh LFP + 0.5 MW / 2 MWh vanadium flow — province-first hybrid demonstration; multi-timescale EMS strategy saves the park over CNY 2.6 M per year.
  • Utility-scale, 14 MW / 40 MWh — EMS service cabinet + O&M forwarding cabinet with layered control, ≤100 ms full-chain response and power-grade cybersecurity.

Project Gallery

Smart Energy Storage Solution (C&I BESS) Smart Energy Storage Solution (C&I BESS) Smart Energy Storage Solution (C&I BESS)

Core Products

Senot HMQ-EMS-300 energy management system - HMQ-EMS-300H/HL — AI Edition (Flagship)

HMQ-EMS-300H/HL — AI Edition (Flagship)

MPN: HMQ-EMS-300H/HL In Stock
Senot HMQ-EMS-300 energy management system - HMQ-EMS-300P/PL — AI Professional (2026)

HMQ-EMS-300P/PL — AI Professional (2026)

MPN: HMQ-EMS-300P/PL In Stock
Senot HMQ-EMS-300 energy management system - HMQ-EMS-300M — Standard (Full)

HMQ-EMS-300M — Standard (Full)

MPN: HMQ-EMS-300M In Stock
Senot HMQ-EMS-300 energy management system - HMQ-EMS-300LB — Utility-Scale

HMQ-EMS-300LB — Utility-Scale

MPN: HMQ-EMS-300LB In Stock

Get Engineering Support

Need a solution tailored to your project? Send us the details and an engineer will reply within 24 hours.

Request Technical Support